TK's staging site |
By * Work to fix Hurricane Ivan-damaged bulkheads along the Navarre Beach Causeway on the south end of the bridge has not been done, and it's about to unravel the agreement that helped lift the 50-cent toll from the only direct link to Navarre Beach
|